Air Conditioning Installation – Fertility Clinic Sheffield

Our engineers have just completed an air conditioning installation for a customer in Sheffield in their medical preparation room.  The Toshiba single split system was installed to add comfort cooling to the area.  A mobile scaffold tower was used for safety due the height of the pipework penetration through the first floor wall.

Recent Posts

Leave a Comment