New Vans
April 4, 2022Mattair – Supporting Youth Bowling
June 22, 2022Elizabethan Manor House
Great photos today from our engineers – lifting the old chiller off the roof and two new heat pumps into position at an Elizabethan Manor House. This is part of ongoing works to reduce operational carbon -we’re replacing the coils inside air handling units and removing the chillers and LPHW systems and replacing them with Toshiba air to air heat pumps from Cool Solutions Distribution Ltd.